Returns a static table of the seven NEM interconnectors. The seventh entry is Project EnergyConnect (PEC), whose Stage 1 was energised on 30 April 2025 with full ~800 MW capability expected mid-2026.
See also
Other reference:
aemo_dlf(),
aemo_mlf(),
aemo_participants(),
aemo_price_caps(),
aemo_regions(),
aemo_settlement(),
aemo_snapshot(),
aemo_units()
Examples
aemo_interconnectors()
#> # aemo_tbl: NEM interconnectors
#> # Source: http://nemweb.com.au
#> # Licence: AEMO Copyright Permissions Notice
#> # Retrieved: 2026-04-28 19:14 UTC
#> # Rows: 7 Cols: 5
#>
#> interconnector_id from_region to_region name
#> 1 NSW1-QLD1 NSW1 QLD1 NSW-QLD Interconnector (QNI)
#> 2 VIC1-NSW1 VIC1 NSW1 VIC-NSW Interconnector (VNI)
#> 3 V-S-MNSP1 VIC1 SA1 Murraylink
#> 4 V-SA VIC1 SA1 Heywood Interconnector
#> 5 T-V-MNSP1 TAS1 VIC1 Basslink
#> 6 N-Q-MNSP1 NSW1 QLD1 Terranora (Directlink)
#> 7 V-S-N NSW1 SA1 Project EnergyConnect (PEC)
#> energised
#> 1 2001-02-18
#> 2 1989-01-01
#> 3 2002-10-03
#> 4 1990-11-01
#> 5 2006-04-29
#> 6 2000-12-14
#> 7 2025-04-30